Total area: 1000ha

Address: Tam Giang Commune, Yen Phong District, Bac Ninh Province

Investor: YENPHONG2-IP-BN

Operation period: 08/2068 – Establishment date: 08/2018

Price: 160 USD/m2 Price does not include VAT

Construction density (%): 60 (%)

Occupancy Rate: Occupancy Rate: 30%

  1. LEGAL INFORMATION OF YEN PHONG II INDUSTRIAL PARK

Yen Phong II Industrial Park was approved to be added to the planning of industrial parks in Vietnam until 2020 according to Decision 1107/QD-TTg dated August 21, 2006 of the Prime Minister with an expected planning area of 300 hectares.

On June 28, 2007, the Prime Minister agreed to approve the policy of building Yen Phong II Industrial, Urban and Service Park with a total area of 1,200 hectares according to Official Dispatch No. 856/TTg-CN. In which, the area of Yen Phong II Industrial Park was adjusted to increase from 300 hectares to 1,000 hectares. Yen Phong II Industrial Park includes 03 sub-areas A, B and C.

Yen Phong II-A Industrial Park

– Location and scale: located on the west side of National Highway 3 and has an area of 151.27 hectares, located in Tam Giang and Hoa Tien communes, Yen Phong district, Bac Ninh province. Of which, the industrial land area is 83.19 hectares.

– Approved by the Prime Minister on investment policy on February 19, 2021, according to Decision No. 220/QD-TTg

– Approved construction zoning plan at scale 1/2000 according to Decision No. 430/QD-UBND dated November 11, 2021 of Bac Ninh Provincial People’s Committee

– Investor: Western Pacific Infrastructure Joint Stock Company, total investment capital of the project is over 1,800 billion VND.

– Term of operation: From 2021 to 2071

For more information about Yen Phong II-A industrial park, please refer to: YEN PHONG II-A INDUSTRIAL PARK

Yen Phong II-B Industrial Park (VSIP Bac Ninh II Industrial Park)

– Location and scale: Yen Phong II-B Industrial Park (or VSIP Bac Ninh II Industrial Park) has a planned area of 273.0022 hectares, located in the communes of Tam Giang, Yen Phu, Hoa Tien and Cho Town, Yen Phong District, Bac Ninh Province. Of which, the industrial land area is 188.7 hectares.

– Approved by the Prime Minister for investment policy according to Decision No. 66/QD-TTg dated January 15, 2019

– Established by the People’s Committee of Bac Ninh province under Decision No. 848/QD-UBND dated December 13, 2019

– Approved construction zoning plan at scale 1/2000 according to Decision No. 605/QD-UBND dated September 27, 2019 of Bac Ninh Provincial People’s Committee

– Investor: VSIP Bac Ninh Company Limited, total investment capital is 2,358 billion VND

– Operation period: from January 22, 2019 to January 22, 2069

For more information about Yen Phong II-B Industrial Park (VSIP Bac Ninh II Industrial Park), please refer here: VSIP BAC NINH II INDUSTRIAL PARK

Yen Phong II-C Industrial Park

– Location and scale: covers an area of 219.22 hectares, located on the east side of provincial road 271, in the communes of Dong Tien and Tam Giang, Yen Phong district, Bac Ninh province. Of which, the industrial land area is 144.69 hectares.

– Approved by the Prime Minister for investment policy according to Decision No. 1139/QD-TTg dated August 11, 2018

– Approved construction zoning plan at scale 1/2000 according to Decision No. 413/QD-UBND dated July 30, 2019

– Investor: Viglacera Corporation – JSC, total investment capital is 2,234 billion VND

– Term of operation: From 2018 to 2068

For more information about Yen Phong II-C industrial park, please refer to: YEN PHONG II-C INDUSTRIAL PARK

  1. CURRENT STATUS OF INVESTMENT IN YEN PHONG II INDUSTRIAL PARK

Currently, of the 3 sub-zones, only Yen Phong II-C Industrial Park has completed construction and put into operation, achieving good investment attraction and occupancy rate. Yen Phong II-A Industrial Park and VSIP Bac Ninh II Industrial Park (Yen Phong II-B) are being urgently implemented by investors in compensation, site clearance, investment procedures and construction of basic infrastructure items. It is expected that these two industrial parks will start operating from 2023.

Category Detail
OVERVIEW:
Infrastructure investor VSIP Bac Ninh Company Limited (VSIP BACNINH) and Western Pacific Infrastructure Joint Stock Company
Location Tam Giang Commune, Yen Phong District, Bac Ninh Province
Acreage Total area 151.27 hectares 282.67 hectares
Factory land area
Available space Green tree density >15%
Greenery ratio Green tree density >15%
Operating time 2057
Current investors
Main industry Clean industry and electronic components and precision engineering industry
Occupancy rate 99%
LOCATION & DISTANCE:
Road Distance from Hanoi Capital: 38km
Air Distance from Noi Bai airport: 22km
Train Distance from Bac Ninh Station: 16.5 km
Seaport Hai Phong port: 145km
INFRASTRUCTURE:
Geology Hard soil: 1.5-2.5kg/cm2
Internal transportation Main Road Width: 32m, Number of lanes: 4 lanes
Sub-branch line Width: 23m, Number of lanes: 2 lanes
Power supply Voltage Power line: 110/22KV
Power source 40MVA
Clean water Capacity TCKCN-VN: 40m3/ha/day
Maximum capacity 6000m3/day
Wastewater treatment system Capacity 6000m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE:
Land Land rental price 150 USD
Lease term 2057
Type/Grade Level A
Payment method Updating
Deposit Updating
Minimum area 1 hectare
Workshop Do not have
Management fee Management fee 0.5 USD/m2
Payment method 3 months/ 12 months
Electricity price Rush hour 0.1 USD
Normal 0.05 USD
Off-peak hours 0.03 USD
Payment method Monthly
Supplier EVN
Clean water price Water price 0.4 USD/m3
Payment method Monthly
Water Supplier Charged by Gov. suppliers
Wastewater fee Price 0.3 USD/m3
Payment method Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees Updating