Located in 2 districts My Loc & Vu Ban, Nam Dinh. The location is on the highway 07 km to Nam Dinh City

▪ My Thuan IP – Hai Phong port: National Highway No.10 -120km
▪ My Thuan IP – Hai Phong port : Coastal road 127km
▪ My Thuan IP – Hai Phong port: Ninh Binh – Hai Phong Expressway (Coming soon)
▪ My Thuan IP – Hai Phong port: Nghia Hung deep-water port, Nam Dinh: 50km (Expected construction)

Ground: Leveling from the field
Background: Clean, flat, hard
Texture: Sandy clay
Land leased price
Negotiable price (50 years land rental included, excluding VAT)
Land in My Thuan Industrial Park is land with one-time payment for 50 years:
• Land rental has been paid to the Government for 50 years, included in the land price and businesses do not have to pay annual land rental fee.
• “Land use rights certificate” has the rights as:
– Can be transferred to others
– Unused factories can be rented to others.
– Mortgage at the bank… (Land leased with annual payment method does not have these rights)
Power system
Total capacity: 180 MVA
➢ The transformer station has a voltage of 110kV, the voltage connected to the electric fence of the secondary investor is 22kV.
➢ My Thuan Industrial Park has two separate power supply lines and belongs to the “Power Supply Priority Area”. Therefore, the power source always ensures a stable production process. 
CLEAN WATER
- Capacity:20.000m3/day night for the Industrial park; Use HDPE pipe, diameter 110 – 200
- Water source: From Dao River, the cleanest river in the area
- Price: 0.6USD/m3 (Excluding VAT)
WASTEWATER
- Capacity: 15.000m3/day night for the Industrial park
- Technology: The most modern technology 100% equipment imported from G7 Countries
- Process output to standard A (QC VN 40/2011- BTNMT).
- Pipes for free using HDPE diameter 250 – 500
- Price of wastewater treatment to column A: 0.5USD/m3 (Excluding VAT)
TRANSPORTATION SYSTEM
2 Lanes Main Roads
Width of secondary road: 21m
Width of main road: 36m
Pavement: 5m
Transport Connection
National Highway 21, National Highway 21B to National Highway 1, National Highway 10 and North-South Expressway to Hanoi, Hai Phong and other Southern provinces The North-South railway passes through Nam Dinh connecting 6 train stations to the other province: (the nearest station is Cau Ho 3.5km). Modern synchronous communication system, Investors do not have to pay any costs
Worker Dormitory
The total area of the Worker Dormitory is 5 hectares, arranged in an open location, the front is “Thien Truong Avenue”, with many support services, convenient for living and traveling.
Salary and benefits
Basic salary: 4.160.000 VND
Communicated with universities, colleges, intermediate schools
- Compulsory Insurance : 32%, detail
- Social insurance: 25.5, in which: Enterprises: 21.5; Employees: 10.5%
- Health Insurance : 4.5%
- Unemployment insurance : 2%
REGULATIONS ABOUT CONSTRUCTION
Construction density:60-70 %
Green density (min):20 %
Floor number (max) 3-5floors
Land use factor 0.6-3.5 times
Setback (min) 3m
- Building 02 rainwater and wastewater drainage systems, connecting to IP infrastructure systems through manholes located in the factory
- Ensure the traffic route inside the factory to serve the fire prevention and fighting work according to regulations
- Underground water must not be exploited for production

