Dong Van I (Extension) Industrial Park
Location ♦ Province: Hanam (GRDP 2023 of US$2.1 billion and RDP per capita in 2023 of $US3,900, economy structure with 70% of industry and construction)

♦ Land type: urban

♦ 45 km to Hanoi Capital Center

♦ 15 km to Phu Ly City Center

♦ 70 km to Noi Bai International Airport

♦ 103 km to Hai Phong Seaport

♦ 270 km to Vietnam – China Border Gate

Total Land area 149ha
Leasing Term 2071
Minimum Lease area 0.5ha
Investment Field Prioritized sectors: ♦ Mechanical industry, automobile manufacturing and auxiliary industry ♦ Group of industries producing electricity, electronic components ♦ Crafts industry group ♦ Food processing industry, production of packaging products

Restricted sectors: Industries that cause environmental pollution through the process of production and discharge (For examples: textile dyeing industry, chemical industry, feed manufactoring, etc)

Construction Information Construction rate: 60%

Workshop buildings: maximum 3 floors

Office buildings: maximum 3 floors

Height Limit of Building: 45m (but can be higher for special case)

Setback: setback of building is 6m from the adjacent road boundary

Road width Main road: 36m

Branch road: 26.5m – 20.5m – 17.5m

Operation Status Completed the essential infrastructure system
Occupancy Rate 20% currently
Leasing Fee US$105/m2 (still negotiable)
Operating Fee ♦ Management fee: 0.5 USD/m2 /year

♦ Fresh water cost: 0.5 USD/m3

♦ Wastewater treatment fee (From Level B to A): 0.44 USD/m3

♦ Electricity cost: same price as regulated by EVN (Normal hour: 0.063 USD Low hour: 0.039 USD Peak hour: 0.11USD)

♦ Waste treatment fee: price provided by waste treatment unit

Minimum Wage and Labor Force Minimum Salary Zone 3 (approximately equivalent to US$161/person/month since July 2024 and might be increased about 6-10% by the order of National Assembly every 2-3 years)

Population of 885 thousand people (60% at working age) and over 95,000 well educated/trained workers available in the labor market

17 local universities, colleges and training institutions in the province with over 18,000 students graduated annually that can be available for recruitment

List of existing clients ♦ ARCV Hanoi (Japan) ♦ Vuong Viet Anh (Vietnam) ♦ Thuan Vien Phat (Vietnam) ♦ Havin (Vietnam) ♦ Hoang Minh Phong (Vietnam) ♦ Elko (Vietnam) ♦ Power Transformer (Vietnam) ♦ Phu Son (Vietnam) ♦ Quang Minh (Vietnam) ♦ MediBros CNC (Vietnam) ♦ Ha Noi Foods (Vietnam) ♦ Ha Thanh (Vietnamese Import and Export Company)