Total area: 402.82ha

Address: Dong Nguyen, Hoan Son, Noi Due and Tuong Giang communes, Tien Du district, Bac Ninh province

Investor: TIENSON-IP-BN

Operation period: 12/2048 – Establishment date: 12/1998

Price: 90 USD/m2 Rental price does not include VAT

Construction density (%): 60 (%)

Occupancy Rate: Occupancy Rate: 100%

Tien Son Industrial Park was established on December 18, 1998 under Decision No. 1129/QD-TTg of the Prime Minister with an area of 134.76 hectares at the time of establishment. Accordingly, the project to invest in construction and business of infrastructure of Tien Son Industrial Park has the investor being the Construction Glass and Ceramics Corporation (VIGLACERA) under the Ministry of Construction, now Viglacera Corporation – JSC, with investment locations in Dong Nguyen, Hoan Son, Noi Due and Tuong Giang communes, Tien Son district, Bac Ninh province (now Tien Du district and Tu Son city – Bac Ninh province). The project was implemented with a total investment capital of VND 267,512 billion and has an operating period of 50 years from the date of investment decision (from 1999-2049).

On June 18, 2003, Tien Son Industrial Park was approved for expansion in Official Letter No. 808/CP-CN of the Prime Minister. Specifically, Tien Son Industrial Park was expanded by about 214.24 hectares, increasing the total planned area of the industrial park to 349 hectares. After that, Tien Son Industrial Park continued to adjust the planned expansion area by an additional 100 hectares (up to 449 hectares) in Decision No. 1107/QD-TTg of the Prime Minister dated August 21, 2006 and adjusted the planned area down to 402 hectares (down 47 hectares compared to the previous plan) in Official Letter No. 1511/TTg-KTN dated August 20, 2014 of the Prime Minister.

On July 8, 2016, Tien Son Industrial Park was officially expanded based on the merger of Tan Hong – Hoan Son Industrial Park according to Decision No. 754/QD-UBND of the People’s Committee of Bac Ninh province. Accordingly, after the merger, Tien Son Industrial Park has an area of 402.82 hectares (of which the merged area from Tan Hong – Hoan Son Industrial Park is 70.77 hectares; The area of Tien Son Industrial Park and Tien Son expansion developed by Vigalcera is 332.05 hectares), Tan Hong – Hoan Son Industrial Park after the merger was renamed Tan Hong – Hoan Son subdivision of Tien Son Industrial Park. The expanded area of Tien Son Industrial Park has an operating period from 2006 to 2056 (50 years).

In terms of nature, Tien Son Industrial Park is a concentrated industrial park, attracting diverse industries with projects in fields such as electronics industry, construction materials production, machinery production, office equipment, stationery; mechanical manufacturing, assembly, ceramic production…

Regarding regional connectivity, Tien Son Industrial Park is directly connected to National Highway 1A (Hanoi – Bac Giang Expressway section) through the Dong Xep Bridge intersection and is located near other large industrial parks in Bac Ninh province such as VSIP Bac Ninh and Dai Dong – Hoan Son, and has good traffic connectivity:

– 30 km from Hanoi city center (40 minutes drive); 36 km from Noi Bai International Airport

– About 8 km from Highway 07 intersection (Hanoi – Thai Nguyen)

– 12 km from Bac Ninh city

– 124 km from Hai Phong port; 135 km from Lach Huyen deep-water port

– About 136 km from Vietnam – China international border gate (Lang Son)

  1. INFRASTRUCTURE SYSTEM OF TIEN SON INDUSTRIAL PARK

Internal traffic system: the area for green roads accounts for 15% of the industrial park area with traffic roads designed in a checkerboard pattern with the main axis width of 41m and branch roads with widths from 11m-23.25m-33.5m, in which the road width is from 11.25m to 22.5m. All traffic routes in the industrial park are arranged with sidewalks 6m wide on each side with trees on both sides and a lighting system.

Power supply system: the power source for production in Tien Son Industrial Park is taken from the national grid through two 110kV/22kV transformer stations built on the technical land of the industrial park with power supply capacity of 40 MVA and 63 MVA respectively. The 22 kV lines are connected underground to the fence of each plot of land and are ready to be connected according to the needs of the investor.

Water supply system: the industrial park is built with a factory to exploit, treat and supply clean water on-site from underground water sources with a water supply capacity of 7,000 m3/day and night and can increase the capacity to a maximum of 11,000 m3/day and night according to the plan.

Wastewater treatment system: All wastewater produced in the industrial park is treated at the factory before being discharged into the centralized wastewater treatment system of the industrial park with a maximum treatment capacity of 7,000 m3/day and night (the built capacity is 4,000 m3/day and night), one of the first wastewater treatment plants in Bac Ninh province with aerobic biological treatment technology using activated sludge. The output wastewater meets environmental technical standards in Vietnam.

Other infrastructure facilities: Fire protection system; Communication system; Leveling the ground with an elevation of +5.5m to +6.2m and a slope of 0.2%; Rainwater drainage system is arranged independently from the wastewater drainage system according to the principle of self-flow; Telecommunication system meets international standards. In addition, the industrial park also has full supporting infrastructure services such as police station, bank, clinic, fuel station, post office, sports ground, housing for officials, workers, etc.

III. LAND RENTAL COSTS AND INVESTMENT INCENTIVES IN TIEN SON INDUSTRIAL PARK

Infrastructure rental price: The industrial park is currently 100% full for lease.

Annual land rent: applied according to the decision of Bac Ninh Provincial People’s Committee at each time

Infrastructure management and maintenance fee: 0.5 USD/m2/year

Electricity price: applied according to EVN’s electricity price list

Water supply price: 0.4 USD/m3, calculated based on actual volume of clean water used

Wastewater treatment fee: from 0.28 USD/m3, calculated on 80% of clean water volume used

Note: The above prices do not include VAT and are subject to change without prior notice.

Investment incentives in Tien Son Industrial Park: 100% exemption from corporate income tax for the first 2 years and 50% reduction from corporate income tax for the next 4 years for new investment projects in the industrial park.

  1. CURRENT STATUS OF INVESTMENT ATTRACTION IN TIEN SON INDUSTRIAL PARK

Since its official construction in 1999 and through many expansions, Tien Son Industrial Park has become one of the largest and oldest industrial parks in Bac Ninh province, one of the first projects to attract foreign investors in the province, laying the foundation for the province’s industrial development in the future and continuing to be a successful industrial park model with full functional areas such as industry, urban, service, and worker housing. Tien Son Industrial Park has currently leased out at an occupancy rate of more than 100 investment projects, including nearly 40 FDI projects. Typical projects operating in the industrial park include the Milk Production Project of VINAMILK Dairy Joint Stock Company (Vietnam); Tien Son ICD Logistics Center; Project to produce supporting products for cameras of CANON Vietnam Co., Ltd. (Japan); Electronic component manufacturing project of SUMITOMO Corporation (Japan); Viet Ha Brewery (Vietnam); ABB Company (Switzerland)…

Category Detail
OVERVIEW:
Infrastructure investor Viglacera Corporation Joint Stock Company – JSC
Location Tu Son town, Bac Ninh province
Acreage Total area 449
Factory land area
Available space Green tree density >15%
Greenery ratio
Operating time 1999
Current investors 126: Canon (Japan), ABB Group (Switzerland), THK Group (Japan)…; and domestic enterprises such as: Tran Hung Dao Mechanical Factory, Viet Ha Beer Company, Vinamilk Dairy Joint Stock Company…
Main industry electronics, mechanics, machine manufacturing
Occupancy rate 1
LOCATION & DISTANCE:
Road Distance from Hanoi Capital: 15km Distance from Samsung Bac Ninh: 15km
Air To Noi Bai International airport: 35km; To Cat Bi – Hai Phong: 120km
Train
Seaport Hai Phong port: 120km
INFRASTRUCTURE:
Geology Sandy soil, K = 0.9
Internal transportation Main Road Width: 37m, Number of lanes: 2 lanes
Sub-branch line Width: 28m, Number of lanes: 2 lanes
Power supply Voltage Power line: 110/22KV
Power source 2x40MVA
Clean water Capacity
Maximum capacity 7,000m3/day
Wastewater treatment system Capacity 6,500m3/day
Internet and telecommunications ADSL, Fireber & Telephone line
LEASING PRICE:
Land Land rental price 100USD
Lease term 2056
Type/Grade Level A
Payment method 12 months
Deposit 0.05
Minimum area 1 hectare
Workshop 5 USD
Management fee Management fee 0.5 USD/m2
Payment method 3 months/12 months
Electricity price Rush hour 0.1 USD
Normal 0.05 USD
Off-peak hours 0.03 USD
Payment method Monthly
Supplier EVN
Clean water price Water price 0.4 USD/m3
Payment method Monthly
Water Supplier Charged by Gov. suppliers
Wastewater fee Price 0.3 USD/m3
Payment method Monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees yes