Total area: 306.9ha

Address: Dong Cuu Commune, Lang Ngam, Dai Bai, Gia Binh District, Bac Ninh Province

Investor: GIABINH-IP-BN

Operation period: 02/2071 – Establishment date: 02/2021

Price: 135 USD/m2 Price does not include VAT

Construction density (%): 60 (%)

Occupancy Rate: Occupancy Rate: 15%

Gia Binh Industrial Park was first approved by the People’s Committee of Bac Ninh province for its detailed construction planning at a scale of 1/2000 on May 12, 2009 and was adjusted twice in 2018 and 2021. On March 17, 2022, Gia Binh Industrial Park was approved by the People’s Committee of Bac Ninh province for its detailed construction planning adjustment project at a scale of 1/2000 in Decision No. 124/QD-UBND, accordingly, Gia Binh Industrial Park has a planning area of 306.69 hectares (of which the industrial land area for lease is 180.7 hectares), with planning locations in Dong Cuu, Lang Ngam and Dai Bai communes, Gia Binh district, Bac Ninh province.

On February 22, 2021, the Gia Binh Industrial Park Infrastructure Investment and Business Project was approved by the Prime Minister in Decision No. 224/QD-TTg. The Gia Binh Industrial Park Project has the investor being Bac Ninh Industrial Park Infrastructure Investment, Construction and Business One Member Co., Ltd. (under CAPELLA LAND – an industrial infrastructure developer with many industrial parks and clusters built nationwide), with a total investment capital of more than VND 2,578 billion and an operating period of 50 years (From 2021-2071). On April 12, 2021, Gia Binh Industrial Park was officially established in Decision No. 127/QD-UBND of the People’s Committee of Bac Ninh province.

In terms of nature, according to the approved planning, Gia Binh Industrial Park is a concentrated industrial park, mainly attracting investment projects in the industries of manufacturing electrical and electronic components and equipment; textiles; processing industry (food for livestock, poultry, aquatic products); construction materials; machinery manufacturing; pharmaceuticals; high-tech products and other supporting industries.

Regarding regional connectivity, Gia Binh Industrial Park is located adjacent to National Highway 17 connecting Trau Quy, Gia Lam, Hanoi to Gia Binh district, Bac Ninh, and is also located near important traffic routes such as DT284 and DT282B, so the industrial park has the ability to connect to traffic:

– 40 km from Hanoi city center, 57 km from Noi Bai international airport

– 23 km from Bac Ninh city center

– About 6 km from Highway 38

– 96 km from Hai Phong port, 106 km from Lach Huyen deep-water port

  1. INFRASTRUCTURE SYSTEM OF GIA BINH INDUSTRIAL PARK

Internal traffic system: designed in a checkerboard pattern with the main road 68m wide, branch roads 22.5m wide, of which the roadway width is 11m to 22m, sidewalks of the roads are 6.5m wide on each side and are arranged with trees.

Power supply system: power source serving production at Gia Binh Industrial Park is provided through a 110kV/22kV transformer station built within the industrial park, with a power supply capacity of 68 MVA.

Water supply system: clean water for production in Gia Binh Industrial Park is taken from the clean water plant in the area with a water supply capacity of 12,600 m3/day and night for the project. Water supply pipes with diameters from D110-D400 mm are built underground along traffic routes in the industrial park to each plot of land, ready to connect according to the needs of investors.

Wastewater treatment system: all wastewater produced in Gia Binh Industrial Park will be collected and treated at the industrial park’s centralized wastewater treatment plant to column B standards before being discharged into the environment. The wastewater treatment plant has a maximum treatment capacity of 8,000 m3/day and night.

Other infrastructure facilities: rainwater drainage system is arranged independently from the production wastewater collection system; Fire hydrant system is arranged along traffic routes in the industrial park; Communication system; Landscape tree system; Lighting system; Land plots in the industrial park are leveled to the planned height before being handed over to investors.

III. LAND RENTAL COSTS AND INVESTMENT INCENTIVES AT GIA BINH INDUSTRIAL PARK

Infrastructure rental price: 135 USD/m2/entire lease term (until 2071)

Annual land rent: Currently, the industrial park is exempted from annual land rent. After the preferential period ends, land rent is determined according to the Decision of the People’s Committee of Bac Ninh province at each time.

Infrastructure management and maintenance fee: VND 10,000/m2/year (equivalent to USD 0.4/m2/year)

Electricity price: applied according to EVN’s electricity price list at each time

Water supply price: 11,500 VND/m3 (calculated on the actual amount of clean water used)

Wastewater treatment fee: 11,000 VND/m3 (calculated on 80% of clean water used)

Note: The above prices do not include VAT and are subject to change without prior notice.

Investment incentives in Gia Binh industrial park

Regarding corporate income tax: 100% exemption from corporate income tax for the first 2 years and 50% reduction from corporate income tax for the next 4 years for new investment projects in industrial parks.

Regarding import tax: import tax exemption for goods on the list of tax incentives imported to create fixed assets for the project.

  1. CURRENT STATUS OF INVESTMENT ATTRACTION IN GIA BINH INDUSTRIAL PARK

Currently, Gia Binh Industrial Park is being rapidly completed by the investor in the construction of industrial infrastructure and has leased out about 15% of the industrial park area with more than 10 investment projects of Vietnamese, Korean and Chinese enterprises. Currently, the investor is continuing to level and complete technical infrastructure works to hand over the site to investors who have leased land in the industrial park for early construction.

Category Detail
OVERVIEW:
Infrastructure investor Capella Real Estate Joint Stock Company
Location Dong Cuu Commune, Lang Ngam, Dai Bai, Gia Binh District, Bac Ninh Province
Acreage Total area 306.9ha
Factory land area 184ha
Available space 175ha
Greenery ratio 15%
Operating time 2071
Current investors Updating
Main industry Production of electrical and electronic components and equipment; Textiles; Processing industry (Food processing, animal feed, poultry, seafood); Construction materials; Machinery manufacturing; High-tech industry; Production of drugs and medicinal materials; Production of plastic products;
Occupancy rate 5%
LOCATION & DISTANCE:
Road Distance from Hanoi Capital: 40km; Distance from Bac Ninh City: 24km
Air 54km from Noi Bai airport
Train 40km from Hanoi station
Seaport 33km from Hai Phong port
INFRASTRUCTURE:
Geology Updating
Internal transportation Main Road 68m
Sub-branch line 22.5m
Power supply Voltage 110/22KV
Power source 61,500 KVA
Clean water Capacity 12,600m3/day and night
Maximum capacity Updating
Wastewater treatment system Capacity 8,000m3/day and night
Internet and telecommunications Updating
LEASING PRICE:
Land Land rental price 95 USD/m2
Lease term 2071
Type/Grade Updating
Payment method Once
Deposit Updating
Minimum area 1 hectare
Workshop Do not have
Management fee Management fee 10,000 VND/m2/year
Payment method Annual
Electricity price Rush hour 2,871 VND/Kwh
Normal 1,555 VND/Kwh
Off-peak hours 1,007 VND/Kwh
Payment method Monthly
Supplier EVN
Clean water price Water price 13,225 VND/m3
Payment method Monthly
Water Supplier Bac Ninh Clean Water Joint Stock Company
Wastewater fee Price 11,000 VND/m3
Payment method Updating
Water quality before treatment B – standard QCVN 40: 2011/BTNMT
Water quality after treatment A – standard QCVN 40: 2011/BTNMT
Other fees Updating