Dinh Tram Industrial Park was established in 2003, the earliest industrial park established in Bac Giang province. The industrial park was approved for detailed planning in Decision No. 1384/QD-BXD dated August 31, 2004 of the Ministry of Construction with an initial planning area of 93.49 hectares.

On May 12, 2010, in Official Dispatch No. 759/TTg-KTN on the project to adjust and supplement the planning of industrial parks in Bac Giang province, the Prime Minister agreed to merge Dong Vang automobile industrial cluster with an area of 38 hectares into Dinh Tram industrial park. Since then, Bac Giang province has also issued Decision No. 1253/QD-UBND dated September 9, 2011 on this merger, according to which the area of Dinh Tram industrial park after the merger is 127.351 hectares.

On October 15, 2015, in Official Dispatch No. 1830/TTg-KTN, the Prime Minister agreed to adjust the planning area of Dinh Tram Industrial Park from 158 hectares to 127 hectares (a reduction of 31 hectares) to suit the current situation and implementation capacity of the project. After that, Dinh Tram Industrial Park continued to have its detailed construction planning adjusted at a scale of 1/2000 in Documents and Decision No. 364/KCN-QHMT dated June 2, 2016 of the Management Board of Industrial Parks of Bac Giang province; Decision 1089/QD-UBND dated July 13, 2016; Decision No. 640/QD-UBND dated September 28, 2017; Decision No. 942/QD-UBND dated October 16, 2020 of the People’s Committee of Bac Giang province.

Currently, Dinh Tram Industrial Park has an adjusted planning area of 92.57 hectares, of which the industrial land area for lease is 69.08 hectares, accounting for 74.63%. The project’s investor is Bac Giang Industrial Park Infrastructure Development Joint Stock Company.

In terms of nature, Dinh Tram Industrial Park is a multi-industry industrial park, attracting mechanical engineering, manufacturing, electronic component processing; consumer goods and construction materials manufacturing industries.

Regarding regional connectivity, Dinh Tram Industrial Park is located in Hoang Ninh and Hong Thai communes, Viet Yen district, Bac Giang province, adjacent to National Highway 1 and National Highway 37, provincial road 295B and:

– 10 km from Bac Giang city center

– 51 km from Hanoi city center

– 51 km from Noi Bai International Airport

– 145 km from Hai Phong port

– 25 km from Samsung Bac Ninh factory

  1. INFRASTRUCTURE SYSTEM OF DINH TRAM INDUSTRIAL PARK

Power supply system: the power source for Dinh Tram Industrial Park is taken from the 110kV/22kV Song Khe – Noi Hoang transformer station managed by Bac Giang Electricity. The 22kV lines are connected to each plot of land in the industrial park.

Water supply system: clean water produced at Dinh Tram Industrial Park is taken from Bac Giang clean water factory through the water supply pipeline system to the factory’s fence.

Wastewater treatment system: all wastewater at Dinh Tram Industrial Park is collected and treated at a centralized wastewater treatment system with a capacity of 2,000 m3/day and night before being discharged into the environment.

Internal traffic system: branch roads in Dinh Tram Industrial Park are built synchronously in the form of basic grid branches and directly connected to National Highway 37, making traffic inside and outside the Industrial Park extremely convenient.

Other infrastructure facilities: Dinh Tram Industrial Park is also fully equipped with infrastructure facilities such as lighting system, wastewater drainage system, communication system, fire protection system, landscape trees…

(Image of the intersection of National Highway 1A and Dinh Tram Industrial Park)

III. LAND RENTAL COSTS AND INVESTMENT INCENTIVES IN DINH TRAM INDUSTRIAL PARK

Infrastructure usage fee: 0.5 USD/m2/year. (remaining term until 2053). Unit price may be changed depending on each time.

Infrastructure management and maintenance fee: VND 9,298/m2/year (equivalent to USD 0.4/m2/year)

Annual land rent: applied according to the land rental price list of Bac Giang province

Electricity price: applied according to EVN’s electricity price list directly managed by Bac Giang Electricity

Water supply price: 13,400 VND/m3, can be changed according to the decision of Bac Giang Provincial People’s Committee

Wastewater treatment fee: 11,400 VND/m3, calculated on 80% of actual clean water used

Note: The above prices do not include VAT and are subject to change without prior notice.

Investment incentives at Dinh Tram Industrial Park

Corporate income tax incentives: 100% exemption from income tax for the first 2 years, 50% reduction in tax payable for the next 4 years for new investment projects in industrial parks.

Import tax incentives: Import tax exemption for goods on the list of tax incentives imported to create fixed assets for enterprises.

CURRENT STATUS OF INVESTMENT ATTRACTION IN DINH TRAM INDUSTRIAL PARK

Currently, Dinh Tram Industrial Park has leased 100% of the industrial park land area with 138 investment projects (including 79 FDI projects) with registered capital of more than 1,782 billion VND and 347 million USD from countries such as China, Korea, Japan and Vietnam… Among them, typical projects include the Electronic Components Manufacturing Project of SUNGWOO Vina Co., Ltd. (Korea); Electronic Components Manufacturing Project of GUV Co., Ltd. (Korea); Plastic Products Manufacturing Project of Sunpla Joint Stock Company; Electronic Components Manufacturing Project of Vietnam Gisan Mobile Co., Ltd….

Category Detail
OVERVIEW:
Infrastructure investor Bac Giang Industrial Park Infrastructure Development Company
Location Viet Yen District, Bac Giang Province
Acreage Total area 127ha
Factory land area
Available space
Greenery ratio
Operating time 2003
Current investors 90 INVESTORS
Main industry High technology, precision engineering, food, electronics…
Occupancy rate 100
LOCATION & DISTANCE:
Road 40km from Hanoi. 10km from Bac Giang
Air 45km from Noi Bai airport
Train Have
Seaport Cai Lan Port (Quang Ninh): 120km, Hai Phong Port: 110km
INFRASTRUCTURE:
Geology soil hardness: 1.5-2.5kg/cm2
Internal transportation Main Road 32m, 4 lanes
Sub-branch line 23m, 2 lanes
Power supply Voltage 110/22KV
Power source 50MVA
Clean water Capacity
Maximum capacity 5,000m3/day and night
Wastewater treatment system Capacity 2,000m3/day and night
Internet and telecommunications ADSL, Fireber
LEASING PRICE:
Land Land rental price 100 USD
Lease term 2053
Type/Grade Level A
Payment method 12 months
Deposit 0.05
Minimum area 1 hectare
Workshop 3 USD
Management fee Management fee 0.3 USD/m2
Payment method 3/12 months
Electricity price Rush hour 0.11 USD
Normal 0.06 USD
Off-peak hours 0.02 USD
Payment method monthly
Supplier EVN
Clean water price Water price 0.4 USD/m3
Payment method monthly
Water Supplier Charged by Gov. suppliers
Wastewater fee Price 0.28 USD/m3
Payment method monthly
Water quality before treatment Level B
Water quality after treatment Level A
Other fees Have