Located in 2 districts My Loc & Vu Ban, Nam Dinh. The location is on the highway 07 km to Nam Dinh City

My Thuan IP – Hai Phong port: National Highway No.10 -120km
My Thuan IP – Hai Phong port : Coastal road 127km
My Thuan IP – Hai Phong port: Ninh Binh – Hai Phong Expressway (Coming soon)
My Thuan IP – Hai Phong port: Nghia Hung deep-water port, Nam Dinh: 50km (Expected construction)

Ground: Leveling from the field
Background: Clean, flat, hard
Texture: Sandy clay

Land leased price
Negotiable price (50 years land rental included, excluding VAT)

Land in My Thuan Industrial Park is land with one-time payment for 50 years:
• Land rental has been paid to the Government for 50 years, included in the land price and businesses do not have to pay annual land rental fee.
• “Land use rights certificate” has the rights as:
– Can be transferred to others
– Unused factories can be rented to others.
– Mortgage at the bank… (Land leased with annual payment method does not have these rights)

Power system
Total capacity: 180 MVA

The transformer station has a voltage of 110kV, the voltage connected to the electric fence of the secondary investor is 22kV.
My Thuan Industrial Park has two separate power supply lines and belongs to the “Power Supply Priority Area”. Therefore, the power source always ensures a stable production process.

CLEAN WATER

  • Capacity:20.000m3/day night for the Industrial park; Use HDPE pipe, diameter 110 – 200
  • Water source: From Dao River, the cleanest river in the area
  • Price: 0.6USD/m3 (Excluding VAT)

WASTEWATER

  • Capacity: 15.000m3/day night for the Industrial park
  • Technology: The most modern technology 100% equipment imported from G7 Countries
  • Process output to standard A (QC VN 40/2011- BTNMT).
  • Pipes for free using HDPE diameter 250 – 500
  • Price of wastewater treatment to column A: 0.5USD/m3 (Excluding VAT)

TRANSPORTATION SYSTEM
2 Lanes Main Roads
Width of secondary road: 21m
Width of main road: 36m
Pavement: 5m

Transport Connection
National Highway 21, National Highway 21B to National Highway 1, National Highway 10 and North-South Expressway to Hanoi, Hai Phong and other Southern provinces The North-South railway passes through Nam Dinh connecting 6 train stations to the other province: (the nearest station is Cau Ho 3.5km). Modern synchronous communication system, Investors do not have to pay any costs

Worker Dormitory

The total area of the Worker Dormitory is 5 hectares, arranged in an open location, the front is “Thien Truong Avenue”, with many support services, convenient for living and traveling.

Salary and benefits

Basic salary: 4.160.000 VND

Communicated with universities, colleges, intermediate schools

  •  Compulsory Insurance : 32%, detail
  • Social insurance: 25.5, in which: Enterprises: 21.5; Employees: 10.5%
  • Health Insurance : 4.5%
  • Unemployment insurance : 2%

REGULATIONS ABOUT CONSTRUCTION

Construction density:60-70 %

Green density (min):20 %

Floor number (max) 3-5floors

Land use factor 0.6-3.5 times

Setback (min) 3m

  • Building 02 rainwater and wastewater drainage systems, connecting to IP infrastructure systems through manholes located in the factory
  • Ensure the traffic route inside the factory to serve the fire prevention and fighting work according to regulations
  • Underground water must not be exploited for production