| Address | Dong Van Ward, Tien Noi Ward, Hoang Dong Ward, Duy Tien Town, Ha Nam Province | |
| Investor | Dong Van III Industrial Park Infrastructure Development Investment Joint Stock Company, Ha Nam Province
Contact office: N2 Road, Dong Van III Supporting Industrial Park, Duyen Town, Ha Nam Province |
|
| Contact | ♦ Mr Tan o Tel: +84 986789186 o E-mail: Tanxd810@gmail.com
♦ Mrs. Hien o Tel: +84 904333910 o E-mail: mrs.thuhien79@gmail.com |
|
| Location | ♦ 45 km to Hanoi Capital Center
♦ 15 km to Phu Ly City Center ♦ 70 km to Noi Bai International Airport ♦ 103 km to Hai Phong Seaport ♦ 270 km to Vietnam – China Border Gate |
|
| Total Land Area | 300 ha | |
| Leasing Term | 50 years (Phase II), 2069. 70 years (Phase I), 2087 | |
| Minimum Lease Area | 0,5 ha | |
| Investment Fields
|
Priority Sectors | Food production and processing. Beverage production. Woven undyed. Manufacture of costumes. Manufacture of leather and related products. Manufacture of rubber products. Prefabricated metal production. Electronic production. Manufacture of electrical equipment, manufacture of means of transport. Paper production. Producing cosmetics, soaps, detergents. Producing drugs, pharmaceutical chemicals and medicinal materials. Glass production. Manufacture of gymnastics and sports equipment. Installation of machinery and industrial equipment. Warehousing and transportation support activities. real estate business. |
| Restricted Sectors | Industries that pollute the environment through production and discharge (For example: textile industry, chemical industry, …) | |
|
Construction Information
|
Construction Rate | 60% |
| Workshop Building | Maximum 3 floors | |
| Office Building | Maximum 3 floors | |
| Height Limit of Building | < 45m (can be higher due to special case) | |
| Setback | Setback of building is 6m from the adjacent road boundary. | |
| Road Width | ♦ Main road: 42m, 36m ♦ Branch road: 20.5m, 17.5m | |
| Available Factory for Rent | None | |
| Operation Status | Completed the essential infrastructure system | |
| Occupancy Rate | 90% | |
| Number of Projects | 55 projects | |
| Leasing Fee | Negotiation | |
|
Operating Fee
|
♦ Management fee: 0,4 USD/m2/year
♦ Fresh water cost: 0,5 USD/m3 ♦ Wastewater treatment fee (From Level B to A): 0,44 USD/m3 ♦ Electricity cost: same price as regulated by EVN (Normal hour: 0,063 USD Low hour: 0,039 USD Peak hour: 0,11USD ♦ Waste treatment fee: price provided by waste treatment unit |
|
| Minimum Wage | Minimum Salary Zone 3 156 USD/month) | |
| List of Clients | ♦ Wistron Infocomm (Taiwan) Co., Ltd. WNC Vietnam (Taiwan). AVC Vietnam (Taiwan). CNC TECH
Ha Nam (Vietnam). GAT Vietnam (Taiwan). DAI HAE UNG (Vietnam). Herbal Medicine Ha Nam (Vietnam). Vinmanutech Ha Nam (Vietnam). Pharmaceutical GMP (Vietnam). VPTECH Ha Nam(Vietnam)…….. |
|
UTILITIES
| Banks | Near Dong Van III Industrial Park, there are many banks concentrated in Dong Van Ward (For example: Vietinbank, Vietcombank, Shinhan Bank, Techcombank, MB Bank, ..) |
| Local Government Agencies | The local government offices of Ha Nam province are located in Phu Ly city, 10 – 12 km from Dong Van III Industrial Park |
| Universities, Colleges and Traning Institutions | 17 Universities, Colleges and Traning Institutions in Ha Nam Province |

